What is your delivery time?

14 Mar, 2026
For sample production (1-5 pieces), we can finish the production within 10 days after payment confirmation and shop drawing approval. For bulk production, the lead time is 50-60 days after payment confirmation, drawing submission and material preparation.

For sample production (1-5 pieces), we can finish the production within 10 days after payment confirmation and shop drawing approval. For bulk production, the lead time is 50-60 days after payment confirmation, drawing submission and material preparation.